Strata Pool 3

New Pool Construction

End-to-end pool construction delivered by a single accountable team.

TDG Pools builds high-performance residential and commercial pools with disciplined project management, clean sequencing, and clear communication—so your project stays on track from design to first swim.

The TDG Difference

One Team. One Plan. One Accountable Build.

Most pool projects fail when responsibility is fragmented across multiple contractors.

TDG Pools runs your build like a professional construction project: one schedule, one scope, and one accountable team coordinating trades, inspections, and milestones—without surprises.

6 steps

Our Construction Process

1. Consultation & Site Review

Access, grading, utilities, sunlight, and layout planning.

2. Design & Budget Alignment

Choose pool type, shape, depth, features, and finishes.

3. Permits & Engineering (as required)

We coordinate permit-ready drawings and required approvals.

4. Excavation & Base Prep

Precise dig, compaction, drainage strategy, and base prep.

5. Pool Install + Equipment Set

Concrete / Vinyl / Fiberglass installation + plumbing/electrical coordination.

6. Decking, Finishing & Startup

Coping/deck, safety items, fill, equipment commissioning, and walkthrough.

Concrete, Vinyl, or Fiberglass We build the right pool for your site and goals.

Concrete Pools (Gunite/Shotcrete)

Best for: Fully custom shapes, luxury features, commercial applications

Why people choose it: Unlimited design flexibility and premium finishes

Considerations: Longer build time and more surface maintenance over time (brushing, resurfacing).

pool cleaning

Vinyl Liner Pools

Best for: Great value, fast builds, smooth feel underfoot

Why people choose it: Lower upfront cost + liner can be replaced to refresh the look

Considerations: Liner replacement typically needed over time; avoid sharp objects.

tool cleaning

Fiberglass Pools

Best for: Fast installation, low maintenance, smooth non-porous surface

Why people choose it: Factory-built shell + quick install + algae-resistant surface

Considerations: Limited to available molds/sizes and delivery access to the backyard.

why choose diamond form

How long does it take to build a new pool ?

Timelines vary by pool type, permits, weather, and site conditions.

Concrete Pool:

~8–12 weeks (curing + finishing)

Vinyl liner Pool:

~4–6 weeks

Fiberglass Pool:

~2–4 weeks

Complex features (retaining walls, steep lots, extensive hardscape) can extend schedules. – Contact Us!

Guiding a pool by the lakeside

New Pool Construction FAQs

Frequently asked questions about our pool construction

It depends on your budget, site access, and the level of customization you want. Concrete is fully custom, vinyl is strong value, and fiberglass is fast + low maintenance.

Typical timelines are fiberglass ~2–4 weeks, vinyl ~4–6 weeks, and concrete ~8–12+ weeks depending on permits, weather, and complexity.

Fiberglass is usually lowest maintenance because it’s non-porous and algae-resistant. Vinyl is also smooth, while concrete typically requires more brushing and upkeep.

Concrete structures can last decades with periodic resurfacing. Fiberglass shells are long-lasting as well, and vinyl pools require liner replacement over time.

Yes. TDG Pools can coordinate permit-ready documentation and manage the inspection sequence as required for your municipality.