New Pool Construction
End-to-end pool construction delivered by a single accountable team.
TDG Pools builds high-performance residential and commercial pools with disciplined project management, clean sequencing, and clear communication—so your project stays on track from design to first swim.
- Permits & Compliance
- Engineering support
- Project scheduling
- Dedicated Project Manager
- Quality-Control Inspections
- Warranty-Backed Installation
The TDG Difference
One Team. One Plan. One Accountable Build.
Most pool projects fail when responsibility is fragmented across multiple contractors.
TDG Pools runs your build like a professional construction project: one schedule, one scope, and one accountable team coordinating trades, inspections, and milestones—without surprises.
6 steps
Our Construction Process
1. Consultation & Site Review
Access, grading, utilities, sunlight, and layout planning.
2. Design & Budget Alignment
Choose pool type, shape, depth, features, and finishes.
3. Permits & Engineering (as required)
We coordinate permit-ready drawings and required approvals.
4. Excavation & Base Prep
Precise dig, compaction, drainage strategy, and base prep.
5. Pool Install + Equipment Set
Concrete / Vinyl / Fiberglass installation + plumbing/electrical coordination.
6. Decking, Finishing & Startup
Coping/deck, safety items, fill, equipment commissioning, and walkthrough.
Concrete, Vinyl, or Fiberglass We build the right pool for your site and goals.
Concrete Pools (Gunite/Shotcrete)
Best for: Fully custom shapes, luxury features, commercial applications
Why people choose it: Unlimited design flexibility and premium finishes
Considerations: Longer build time and more surface maintenance over time (brushing, resurfacing).

Vinyl Liner Pools
Best for: Great value, fast builds, smooth feel underfoot
Why people choose it: Lower upfront cost + liner can be replaced to refresh the look
Considerations: Liner replacement typically needed over time; avoid sharp objects.

Fiberglass Pools
Best for: Fast installation, low maintenance, smooth non-porous surface
Why people choose it: Factory-built shell + quick install + algae-resistant surface
Considerations: Limited to available molds/sizes and delivery access to the backyard.

How long does it take to build a new pool ?
Timelines vary by pool type, permits, weather, and site conditions.
Concrete Pool:
~8–12 weeks (curing + finishing)
Vinyl liner Pool:
~4–6 weeks
Fiberglass Pool:
~2–4 weeks
Complex features (retaining walls, steep lots, extensive hardscape) can extend schedules. – Contact Us!
New Pool Construction FAQs
Frequently asked questions about our pool construction
It depends on your budget, site access, and the level of customization you want. Concrete is fully custom, vinyl is strong value, and fiberglass is fast + low maintenance.
Typical timelines are fiberglass ~2–4 weeks, vinyl ~4–6 weeks, and concrete ~8–12+ weeks depending on permits, weather, and complexity.
Fiberglass is usually lowest maintenance because it’s non-porous and algae-resistant. Vinyl is also smooth, while concrete typically requires more brushing and upkeep.
Concrete structures can last decades with periodic resurfacing. Fiberglass shells are long-lasting as well, and vinyl pools require liner replacement over time.
Yes. TDG Pools can coordinate permit-ready documentation and manage the inspection sequence as required for your municipality.
Still Have Questions ?
What question or topic would you like assistance with today?
